1.3 Post Office Migration Process

A post office migration is carried out in two stages to minimize downtime for GroupWise users. During the first stage, the Server Migration Utility performs the following tasks:

After the first stage, you perform some testing of the migrated post office by:

The Server Migration Utility then stops the Linux POA in preparation for the second stage of the post office migration. You also have some manual steps to perform in preparation for the second stage:

During the second stage, the Server Migration Utility performs the following tasks:

After the post office migration is complete, you have two more manual steps to perform:

Step-by-step instructions for each part of this process are found in Section 7.0, Migrating a Post Office and Its POA to Linux.

If the Server Migration Utility is unable to migrate a post office, you can perform the steps yourself, as described in Section 11.0, Manually Migrating a Post Office and Its POA to Linux.